The duration varies based on the project's size and complexity. Generally, it can take between three to six months, accounting for planning, design, permits, construction, and finishing.
Acquiring permits depends on your location and the scope of the addition. Usually, building permits, zoning approvals, and sometimes architectural review board permissions are required. Our team manages these aspects to ensure compliance.
A professional assessment is crucial. Our team evaluates your home's structure, foundation, utilities, and available space to determine feasibility. We collaborate with structural engineers and architects to ensure safety and structural integrity.
Our goal is to minimize disruption as much as possible. We plan and schedule work to ensure the least inconvenience to your daily life. We maintain clear communication and strive for a smooth construction process.
Several elements affect the overall cost, such as the size of the addition, materials used, labor, permits, and the complexity of design. We provide detailed cost breakdowns and work closely with clients to ensure transparency throughout the project.