Remodeled kitchen in Raleigh, NC with white cabinets, brass hardware, a farmhouse sink, and herringbone floors

Kitchen renovation

A white kitchen and a new bedroom in Raleigh

Town
Raleigh
Service
Kitchen renovation
Typical timeline
A simple renovation takes at least 8 months from the start of Design to move-in.
Your timeline is set in writing during Design, before you commit to construction.
Starting price
Projects like this start at $100,000.

The project

They had lived with a kitchen they didn’t love for years. We kept the layout that worked and gave them a high-quality kitchen they love.

We also repurposed space in the house into a new bedroom.

Scope

  • Kitchen layout kept the same
  • New white cabinets with brass hardware and a range hood
  • Farmhouse sink and brass faucet
  • New countertops and backsplash
  • Herringbone floors in place of the old checkered tile
  • Space in the house repurposed into a new bedroom

What the client said

“We recently hired Oak City to remodel our kitchen and repurpose space in our house to convert it into a bedroom. Working with them was a pleasure throughout the process. They are helpful, transparent, informative and they listen to their customers. They do great work!”

Richard V.
  • Before The Raleigh kitchen before the remodel, with white cabinets and a checkered tile floor
    After The same Raleigh kitchen after the remodel, with new white cabinets, a range hood, and herringbone floors
    From the breakfast room, before and after.

Let’s plan your project

Start with a free discovery call about your goals, timeline, and budget. You’ll know where you stand before you sign anything.