Remodeled kitchen in Cary, NC with cream cabinets, a range hood, a farmhouse sink, and a brass faucet

Design-Build in Lochmere

Additions and renovations in Lochmere

You love the lakes and your neighbors. If the house is what’s holding you back, we can change that.

Planned in the 1980s, built out by the 90s

Lochmere was approved in the early to mid 1980s and built out over the next decade or so. By our count of Wake County records, more than nine in ten of its houses went up in the 1980s and 90s.

That makes most of them 30 to 40 years old. At that age, kitchens, baths, and floor plans are often due for an update.

Updating a 1980s floor plan

We open kitchens to the family room, rebuild primary baths, and take on whole-home renovations when everything is due at once.

On a lot with room to spare, a sunroom or a main-floor primary suite can make the house work for the long haul.

HOA review and lake buffers

Every home belongs to the Lochmere master association, and some also belong to one of its eight sub-associations. The architecture committee reviews new rooms, garages, and changes to siding or roofing before work starts.

Lots near the HOA’s lakes or Swift Creek can also carry buffers and watershed limits from the Town of Cary. We check them during Design, then handle permits and inspections with the town.

See more of our work in Cary

What we build in Lochmere

Every project is designed and built by one team, with a fixed price before construction begins.

Reviews and a license aren’t enough anymore

  • Peace of Mind Pricing

    Your construction price is fixed before we break ground. It only changes if we uncover something unforeseen or you request a change.

  • One team

    Design and construction under one roof. Your designer leads Design, and your project manager owns Build and warranty.

  • Weekly portal updates

    Your schedule and progress, updated every week in your client portal, so you’re never wondering what’s happening.

  • Named people at every stage

    Bethany Kuhnau, our senior designer, leads Design. Mike Simon, our project manager, is your point of contact from pre-construction through warranty.

Our promise You’ll always know where your project stands, what comes next, and why.

What our clients say

Lochmere questions

How long does Lochmere’s architectural review take?

The committee has 30 days from receiving a complete request. If you’re in a sub-association, it approves first.

Once approved, work has to start within three months and finish within a year.

What do we need to submit for an addition?

For an addition built by a contractor, Lochmere’s standards say the design drawings should be enough, showing rooflines and other details. Trees to be removed go on a plot plan.

We prepare all of it during Design.

Are there extra rules if we back up to a lake?

Often, yes. Cary adds a 50-foot buffer beyond the state’s Neuse River buffer along lakes and streams, which limits building near the water.

We find where it falls on your lot before design starts.

Fall in love with your home again

Start with a free discovery call about your goals, timeline, and budget. You’ll know where you stand before you sign anything.