Sink under a window with wood cabinets and pendant lights in a remodeled Wake Forest, NC kitchen

Design-Build in Heritage

Home additions in Heritage

Your house in Heritage still works. It just needs room for the life you’ve built since you moved in.

A newer community with room to grow

Heritage was built as a golf course community starting in the early 2000s, and Heritage Golf Club opened in 2001. By our count of Wake County records, about half its houses went up in the 2000s and most of the rest in the 2010s.

These houses don’t need saving. They need to fit a family that’s grown, a parent moving in, or more time spent at home.

Adding on to a newer house

By our count, the typical lot here is about a quarter acre, so every square foot of an addition matters. We plan it to fit your lot, your setbacks, and the way you use the backyard.

You can add a sunroom that opens to the yard, a suite for a parent, a main-floor primary suite, or living space over the garage.

HOA approval, then the town

In Heritage Wake Forest Two, the Master ARC reviews structural changes, and new materials must match the house. The town may not issue a permit without the association’s written approval.

Most of Heritage is inside Wake Forest’s town limits, but part of it falls under Rolesville. We check which rules apply to your lot during Design, then handle the permits and inspections.

See more of our work in Wake Forest

Our work in Wake Forest

See all projects

What we build in Heritage

Every project is designed and built by one team, with a fixed price before construction begins.

Reviews and a license aren’t enough anymore

  • Peace of Mind Pricing

    Your construction price is fixed before we break ground. It only changes if we uncover something unforeseen or you request a change.

  • One team

    Design and construction under one roof. Your designer leads Design, and your project manager owns Build and warranty.

  • Weekly portal updates

    Your schedule and progress, updated every week in your client portal, so you’re never wondering what’s happening.

  • Named people at every stage

    Bethany Kuhnau, our senior designer, leads Design. Mike Simon, our project manager, is your point of contact from pre-construction through warranty.

Our promise You’ll always know where your project stands, what comes next, and why.

What our clients say

Heritage questions

Who issues the permit for an addition in Heritage?

Most of Heritage is in the Town of Wake Forest, but part of it falls under Rolesville’s planning jurisdiction. We confirm which rules and permit office apply to your lot during Design, then handle the permit.

Does the HOA have to approve an addition first?

Yes. In Heritage Wake Forest Two, the Master ARC reviews structural changes, and the town may not issue a permit without that written approval.

Some sub-associations have their own review committee too.

Will an addition match the rest of the house?

It has to. Heritage Wake Forest Two requires siding and shingles that match the existing house, and it doesn’t allow vinyl or aluminum siding or tile roofs.

Fall in love with your home again

Start with a free discovery call about your goals, timeline, and budget. You’ll know where you stand before you sign anything.