Primary bathroom addition in Fuquay-Varina, NC with a tile shower and a green double vanity

Primary suite addition

A primary suite addition in Fuquay-Varina

Town
Fuquay-Varina
Service
Primary suite addition
Typical timeline
An addition often takes 12 months or more from the start of Design to move-in.
Your timeline is set in writing during Design, before you commit to construction.
Starting price
Projects like this start at $150,000.

The project

The homeowners were living with a tiny bedroom, a tiny bathroom, and almost no closet, and they wanted this house to be their forever home. Working within their budget, we designed an expanded primary suite with a new bedroom, bathroom, and fully custom closet they love.

What the family wanted

  • A more comfortable, functional primary suite
  • A spacious walk-in closet
  • A larger, modern bathroom
  • An office nook for work and hobbies
  • New space that blends with the existing home

The challenges

  • The original bedroom, bathroom, and closet were small and cramped
  • The electrical system needed upgrading for the new space
  • The roofline called for a flat roof section to tie the addition in properly
  • Poor soil conditions required engineering before foundation work

Weather delays during framing and soil testing were both resolved without derailing the project.

How we built it

  1. Removed exterior brick and excavated
  2. Concrete footings with engineering oversight
  3. Steel columns and framing
  4. Roofing, windows, and exterior finishes
  5. Plumbing, HVAC, and electrical rough-in
  6. Insulation, drywall, and trim
  7. Flooring, paint, and the tile shower

The result

The family now has a larger bedroom, a bathroom with a standout tile shower, a walk-in closet, and a bright office nook. New windows, insulation, and sealed HVAC also made the home more comfortable and efficient.

Scope

  • Larger primary bedroom
  • New primary bathroom with a tile shower and glass panel
  • Walk-in closet
  • Office nook with a window and built-in desk in the old closet space
  • Board-and-batten Hardie plank exterior to match the house
  • Herringbone LVP flooring and a sage green vanity
  • Steel columns supporting the bedroom expansion
  • Electrical upgrades, energy-efficient windows, insulation, and sealed HVAC

What the client said

“Super quick and professional response times to questions and concerns. My husband and I experienced a seamless process with the company and were extremely pleased with the outcome.”

Ellen K.
  • Before The back of the brick home in Fuquay-Varina before the primary suite addition
    After The finished primary suite addition in Fuquay-Varina, clad in board-and-batten siding and supported by steel columns
    The back of the home before, and the finished addition on steel columns.
  • Before The small Fuquay-Varina primary bathroom before the addition
    After The new primary bathroom with a tile shower and a sage green vanity in Fuquay-Varina
    The old primary bath, and the new one.

Let’s plan your project

Start with a free discovery call about your goals, timeline, and budget. You’ll know where you stand before you sign anything.